Listed: Jun 8, 2026

WBS21CS0XR9U56397 , 2024 Bmw Xm (G09) 4.4, Sold!

2024 Bmw Xm (G09) 4.4 Sold VIN WBS21CS0XR9U56397 – front exterior

About this vehicle: VIN WBS21CS0XR9U56397 is a 2024 BMW XM (G09) 4.4 in Sold condition with 15,967 km shown. Use this auction-check page for photos and specs before you bid, buy, or ship.

Share

More about this VIN page

This page is the auction-check record for VIN WBS21CS0XR9U56397. It contains the latest available information about this 2024 BMW XM (G09) 4.4 including photographs from the auction lot, odometer readings, damage category, listed condition, estimated value where available, and provenance details from the originating marketplace. The Vehicle Identification Number WBS21CS0XR9U56397 is a unique 17-character code assigned at manufacture that encodes the country of origin, manufacturer, vehicle type, restraint system, model line, engine type, and production sequence for this specific unit.

Buyers researching VIN WBS21CS0XR9U56397 typically want to confirm whether this BMW XM (G09) 4.4 has been through a salvage auction, whether it carries a clean or rebuilt title, and what the recorded mileage was at the time of sale. The details above are extracted directly from the auction feed and should be verified against official government title records and an independent mechanical inspection before purchase. At last record, the odometer showed 15,967 km.

VIN Details

VIN
WBS21CS0XR9U56397
Make
BMW
Model
XM (G09) 4.4
Year
2024
Mileage
15,967 km
Transmission
Automatic
Color
Black
Fuel
Gasoline + Electric
Est. Value
157800000

Title chains & bundle reports

This view highlights auction feed data: photos, odometer, damage, and platform. For government title brands, recalls, and NMVTIS-style chains, see our pricing.

Remove listing from site — $1

Pay with PayPal on the pricing page. Listing is deleted automatically after confirmed payment.

By purchasing this service you agree to our Terms of Service. Successful payment triggers automatic deletion of this listing.

More BMW XM (G09) 4.4 listings

More indexed VIN reports