WBS21CS06P9S34484 , 2023 Bmw Xm (G09) 4.4, Sold!

About this vehicle: VIN WBS21CS06P9S34484 is a 2023 BMW XM (G09) 4.4 in Sold condition with 15,043 km shown. Use this auction-check page for photos and specs before you bid, buy, or ship.
More about this VIN page
This page is the auction-check record for VIN WBS21CS06P9S34484. It contains the latest available information about this 2023 BMW XM (G09) 4.4 including photographs from the auction lot, odometer readings, damage category, listed condition, estimated value where available, and provenance details from the originating marketplace. The Vehicle Identification Number WBS21CS06P9S34484 is a unique 17-character code assigned at manufacture that encodes the country of origin, manufacturer, vehicle type, restraint system, model line, engine type, and production sequence for this specific unit.
Buyers researching VIN WBS21CS06P9S34484 typically want to confirm whether this BMW XM (G09) 4.4 has been through a salvage auction, whether it carries a clean or rebuilt title, and what the recorded mileage was at the time of sale. The details above are extracted directly from the auction feed and should be verified against official government title records and an independent mechanical inspection before purchase. At last record, the odometer showed 15,043 km.
VIN Details
- VIN
- WBS21CS06P9S34484
- Make
- BMW
- Model
- XM (G09) 4.4
- Year
- 2023
- Mileage
- 15,043 km
- Transmission
- Automatic
- Color
- Jade green
- Fuel
- Gasoline + Electric
- Est. Value
- 153800000
Title chains & bundle reports
This view highlights auction feed data: photos, odometer, damage, and platform. For government title brands, recalls, and NMVTIS-style chains, see our pricing.
Pay with PayPal on the pricing page. Listing is deleted automatically after confirmed payment.
By purchasing this service you agree to our Terms of Service. Successful payment triggers automatic deletion of this listing.