Listed: May 23, 2026

WBS42AZ020CR44636 , 2024 Bmw M4, Used!

2024 Bmw M4 Used VIN WBS42AZ020CR44636 – front exterior

About this vehicle: VIN WBS42AZ020CR44636 is a 2024 BMW M4 in Used condition with 27,345 km shown; primary damage noted as Malicious. Use this auction-check page for photos and specs before you bid, buy, or ship.

Share

More about this VIN page

This page is the auction-check record for VIN WBS42AZ020CR44636. It contains the latest available information about this 2024 BMW M4 including photographs from the auction lot, odometer readings, damage category, listed condition, estimated value where available, and provenance details from the originating marketplace. The Vehicle Identification Number WBS42AZ020CR44636 is a unique 17-character code assigned at manufacture that encodes the country of origin, manufacturer, vehicle type, restraint system, model line, engine type, and production sequence for this specific unit.

Buyers researching VIN WBS42AZ020CR44636 typically want to confirm whether this BMW M4 has been through a salvage auction, whether it carries a clean or rebuilt title, and what the recorded mileage was at the time of sale. The details above are extracted directly from the auction feed and should be verified against official government title records and an independent mechanical inspection before purchase. At last record, the odometer showed 27,345 km. Primary damage is listed as Malicious, which may affect insurability, repair cost, and resale value.

Summary

2024 Bmw M4 · written from auction listing sources

Prepare to have your senses ignited! We're talking about a phenomenal 2024 BMW M4, a machine engineered for pure exhilaration that defines the ultimate driving experience. This isn't just a car; it's a statement, a testament to performance art crafted for those who demand nothing less than perfection.

Under the sculpted hood lies the heart of a true predator, a Direct Injection Petrol engine craving Premium ULP, ready to unleash breathtaking power at a moment's notice. Paired with its lightning-fast 8-Speed Sports Automatic transmission, every gear shift is seamless, translating raw force into an unparalleled surge of acceleration. Get ready for a symphony of mechanical precision and a driving dynamic that will truly electrify your soul.

Imagine a virtually brand-new icon, with only 27,345 kilometers gracing its odometer – barely a stretch of its legs for a 2024 model. This M4 represents an exceptional opportunity to command a cutting-edge performance vehicle without the new car premium. It’s poised and eager, just waiting to carve its next set of unforgettable memories with you.

Step inside and feel the embrace of M-specific luxury, where every detail is meticulously crafted to enhance your connection with the road. This isn't merely transportation; it's an extension of your will, offering razor-sharp handling and an intuitive responsiveness that makes every curve a thrilling dance. Experience the perfect harmony of track-ready capability and sophisticated everyday usability that only an M4 can provide.

Opportunities like this, to own a high-performance legend with such low mileage, don't linger for long on the market. This 2024 M4 offers an unmatched blend of power, prestige, and modern technology, an investment in pure driving joy. Don't miss your chance to elevate your daily commute into an adrenaline-fueled adventure and make a powerful statement wherever you go.

Seriously, why just dream about an M-car when you can make this dream a roaring reality today? Come down and feel the undeniable presence of this magnificent BMW M4 for yourself. Prepare to be utterly captivated, because once you experience its prowess, nothing else will compare.

VIN Details

VIN
WBS42AZ020CR44636
Make
BMW
Model
M4
Year
2024
Mileage
27,345 km
Transmission
8 Spd Sports Automatic
Fuel
Direct Injection Petrol - Premium ULP
Damage
Malicious

Title chains & bundle reports

This view highlights auction feed data: photos, odometer, damage, and platform. For government title brands, recalls, and NMVTIS-style chains, see our pricing.

Remove listing from site — $1

Pay with PayPal on the pricing page. Listing is deleted automatically after confirmed payment.

By purchasing this service you agree to our Terms of Service. Successful payment triggers automatic deletion of this listing.

More BMW M4 listings

More indexed VIN reports