Listed: Jun 3, 2026

WBS31BA08RCN94149 , 2024 Bmw M4 (G82) M4 Convertible Competition M Xdrive, Sold!

2024 Bmw M4 (G82) M4 Convertible Competition M Xdrive Sold VIN WBS31BA08RCN94149 – front exterior

About this vehicle: VIN WBS31BA08RCN94149 is a 2024 BMW M4 (G82) M4 Convertible Competition M xDrive in Sold condition with 22,373 km shown. Use this auction-check page for photos and specs before you bid, buy, or ship.

Share

More about this VIN page

This page is the auction-check record for VIN WBS31BA08RCN94149. It contains the latest available information about this 2024 BMW M4 (G82) M4 Convertible Competition M xDrive including photographs from the auction lot, odometer readings, damage category, listed condition, estimated value where available, and provenance details from the originating marketplace. The Vehicle Identification Number WBS31BA08RCN94149 is a unique 17-character code assigned at manufacture that encodes the country of origin, manufacturer, vehicle type, restraint system, model line, engine type, and production sequence for this specific unit.

Buyers researching VIN WBS31BA08RCN94149 typically want to confirm whether this BMW M4 (G82) M4 Convertible Competition M xDrive has been through a salvage auction, whether it carries a clean or rebuilt title, and what the recorded mileage was at the time of sale. The details above are extracted directly from the auction feed and should be verified against official government title records and an independent mechanical inspection before purchase. At last record, the odometer showed 22,373 km.

VIN Details

VIN
WBS31BA08RCN94149
Make
BMW
Model
M4 (G82) M4 Convertible Competition M xDrive
Year
2024
Mileage
22,373 km
Transmission
Automatic
Color
Black
Fuel
Gasoline
Est. Value
99800000

Title chains & bundle reports

This view highlights auction feed data: photos, odometer, damage, and platform. For government title brands, recalls, and NMVTIS-style chains, see our pricing.

Remove listing from site — $1

Pay with PayPal on the pricing page. Listing is deleted automatically after confirmed payment.

By purchasing this service you agree to our Terms of Service. Successful payment triggers automatic deletion of this listing.

More BMW M4 (G82) M4 Convertible Competition M xDrive listings

More indexed VIN reports